Projects

Each project is engineered for reliability, serviceability, and long-term performance in real-world conditions.

From small retrofits to complete new builds, JPR Industries has delivered structural, mechanical, and material handling projects across farms, feed lots, and commercial facilities.

01

Barrhill Feed Mill Expansion

Client

Barrhill Feeders

LOCATION

Lethbridge County near Picture Butte, Alberta

Project Summary

From June 2023 to April 2024, we completed an expansion of the Barrhill Feed Mill near Picture Butte, Alberta. This project involved a structural addition to house an additional temper bin, roller mill, and rolled storage bin, alongside two new hopper bins with a dedicated receiving system. We successfully navigated two primary challenges: seamlessly matching the existing facility’s architecture and addressing unexpected soil conditions that necessitated an immediate pile foundation redesign. The finished expansion provides a cohesive, high-capacity extension of their current grain processing operations.
Industrial feed mill construction with silos and cranes.

02

Chinook Feeders Feed Mill Expansion

Client

Chinook Feeders Ltd.

LOCATION

Foothills County, East Of Nanton, Alberta

Project Summary

From July 2024 to February 2026, we executed our largest project to date: the complete demolition and high-scale reconstruction of the Chinook Feeders mill. This expansion features a sophisticated new design and process flow centered around two independent steam flaking systems, twin 500hp boilers, four temper bins, and dual roller mills. Beyond significantly increasing storage capacity, the facility is engineered for extreme logistics efficiency, anchored by a high-speed grain handling system capable of unloading a full Super B in just five minutes. Despite the technical challenges of a first-of-its-kind design and massive scale, we delivered a high-performance facility that sets a new regional benchmark for feed production.
Industrial feed mill equipment at JPR Industries Inc. for Chinook Feeders expansion project.

03

Schooten & Son’s Mossleigh Feed Mill

Client

Schooten & Sons Mossleigh Lot

LOCATION

Mossleigh, Alberta

Project Summary

Between October 2022 and January 2024, we constructed a high-capacity feed mill for Schooten & Son’s Mossleigh. The facility features 900 tons of overhead temper and rolled storage bins integrated with three precision roller mills to significantly expand grain handling capabilities. We successfully managed a critical one-week installation window for the large precast receiving system. The completed mill provides a robust, high-volume infrastructure solution designed to meet demanding operational schedules and increased storage requirements.
Grain storage silos at Schooten & Son's Mossleigh Feed Mill, Alberta, Canada.

04

White Lake Feeders

Client

White Lake Colony

LOCATION

Lethbridge County, Nobleford, Alberta

Project Summary

From August 2024 to February 2026, we constructed a ground-up tempering mill for White Lake Colony in Lethbridge County. This precast facility features 330,000 bushels of grain storage and a high-efficiency multi-hopper truck receiving system. A key component of this project was our direct collaboration with the Colony on the fabrication process, ensuring the custom-designed infrastructure met their specific operational requirements. The result is a high-capacity, durable mill that significantly scales their grain handling and storage capabilities.
Grain storage silos and equipment at White Lake Feeders site.